CNG — Construction North Group Ltd
York College Front of House refurbishment

York College.

At York College, we delivered a comprehensive front-of-house refurbishment to enhance the student and visitor experience. The project included installing a bespoke reception desk, creating a modern administration area for staff, and carrying out refurbishment works across three floors of the library, improving functionality, comfort, and visual appeal throughout.

About the project.

Reception — York College Front of House

Reception.

Reception works included remodelling the area, manufacturing and installing a new reception desk, integrating audio-visual systems, and delivering bespoke joinery for a modern, functional space.

Active Image — York College Front of House

Administration.

Administration area remodelling and refurbishment included installing new floors and walls, incorporating glazed partitions, and upgrading the space to create a modern, functional, and flexible working environment.

Library — York College Front of House

Library.

Library works included the lift and shift of 10,000 books, enabling new floor finishes and lighting upgrades across three floors, creating a refreshed and functional space for the students.

Key data.

Value£635,000GBP
Duration8Weeks
Area16,000Sqft

Image gallery.

York College Front of House project image 1
York College Front of House project image 2
York College Front of House project image 3
York College Front of House project image 4
01 / 05
York College Training Suite & Student Lounges

Immersive Room.

We were delighted to deliver York College’s groundbreaking Cube 360 Immersive Room, transforming a former classroom into a fully interactive space. Featuring 360-degree projection across four walls and the floor, it offers limitless learning environments, enhancing teaching and engagement across multiple curriculum areas.

About the project.

Training Suite — York College

Walls.

Works included stripping out the existing space and constructing four new partition walls in white, creating a reconfigured, functional environment for interactive and immersive experiences.

Active Image — York College Training Suite

Ceilings.

Ceiling works included installing a new grid and suspended ceiling, creating a dark, contrasting backdrop to the walls, enhancing the immersive atmosphere and overall spatial design.

Café Area — York College Training Suite

Lighting.

Lighting works included the design, supply, and installation of a new LED lighting system with integrated controls, providing energy-efficient, flexible, and tailored illumination throughout the space.

Key data.

Value£50,000GBP
Duration4Weeks
Area1,000Sqft

Image gallery.

York College Training Suite project image 1
York College Training Suite project image 2
York College Training Suite project image 3
York College Training Suite project image 4
01 / 10